A cesspool can be made in several ways. The best of them is one that will ensure the operation of the pit according to the principle of a modern septic tank. But it will require significantly larger investments and labor.
The easiest way to solve the problem of waste water disposal is to make a cesspool. Its device will not cause difficulties, since this design is one of the simplest.
Cesspool requirements
The fluid entering the pit can wash the soil, which can lead to its collapse. Therefore, the walls of the cesspool must be strengthened. This can be done in several ways: using brickwork, monolithic concrete, durable plastic sheet. The cesspool must be at least 15 m from the nearest buildings, and 25 m from the water intake point.
The pit area should be sufficient to accept salvo discharge. The drainage system should be equipped with ventilation, which will accelerate the pace of waste processing. The pit will require periodic cleaning, so its location must be such that specialized equipment can be accessed to it.